Graded Discussion board
Graded Discussion board will be opened on Friday 2nd February 2018. It will remain open till Monday 5th February 2018.
Pro-tech software house is currently working on a project of developing a “Printer Management system”. The scope of this project is limited due to which this project was scheduled to complete in only 3 months. There was a limited set of requirements for this project given by client. With passage of time the requirements are changing for this project, but to very limited extent. Due to changing requirements the project scheduled time is now increased from 3 months to 4 months.
Being a member of requirement engineering team do you think that requirement traceability is vital for such a limited scope project? Discuss your answer with proper reasons.
A concise, coherent and to the point comment is preferred over lengthy comment having irrelevant details. Your comment must not be more than 4-5 lines. Comments, posted on regular Lesson's MDB or sent through email will NOT be considered in any case. Any request about such an acceptance will not be catered.
Read the following instructions carefully before sending your comments:
1. Your discussion must be based on logical facts and in depth knowledge of topic is must for that.
2. Your comments should be relevant to the topic i.e. clear and concise.
3. You should post your comments on Graded Discussion Board & not on the Regular MDB.
4. Books, websites and other reading material may be consulted before posting your comments.
6. No extra time will be given for discussion.
7. You cannot participate in the discussion after the due date or through e-mail.
8. All times are in Pakistan Standard Time (PKT)