CS605: Software Engineering-II
Every task should be
assigned to a specific team -------------.
- Member p#89
- Manager
- Organizer
- None of the given
Which one is not
the Software project planning activity carried out by the project manager for
estimation?
- Software scope estimation
- Resources requirements
- Time requirements
- Product
Quality p# 75
While performing risk analysis, the impact of risk can not be measured quantitatively
Degree of uncertainty that the product will meet its requirements
and be fit for its intended use is the
- Cost
risks
- Schedule
risks
- Performance
risks p# 83
- None of
the given choices
Question No: 10 ( Marks: 1 ) - Please choose one Timeline chart is also known as the _____________ chart
- ► Gantt (Page 100)
- ► PERT
- ► FREE LANCE
- ► None of the given
Proactive risk
management philosophy is also some times termed as Indiana Jones School of risk
management
·
False p#80
Defect Removal Efficiency (DRE) can be measured by
where E is Errors found delivery and D is error found
after delivery (typically within the first year of operation)
- DRE=
E/ (E+D) p#65
- DRE= E - (E+D)
- DRE= E * (E+D)
- None of the given
Integrity means
that the software should
- Help the users to enjoy
usability
- None of the given
- Withstand
the attack from a hacker p#65
- Help the hacker to hack
the system
h In function
point analysis technique EO stands for
- Export operation
- Export output
- External output p#44
- None of these
Which of these
software characteristics are used to determine the scope of a software project?
- Context, lines of code,
function
- Context, function,
communication requirements
- Information objectives,
function, performanc
- Communications
requirements, performance, information objectives p#75
______________
is the first stage of waterfall lifecycle model
- Requirement
definition p#13
- Operation
- Unit testing
- Implementation
___________ is
not the part of software development loop.
- Status Quo
- Problem definition
- Technical development
- Task
set p#8
__________ is
not the management part of software development activities.
- Coding
p#7
- Configuration Management
- Quality Assurance
- Project planning
_____________________
Phase in a software process focuses on change.
- Vision
- Maintenance p#12
- Definition
- Development
________________ Model
is adopted by Microsoft
- RAD
- Build and Fix
- Spiral
- Synchronize and Stabilized p#17
______________ Model
has a major drawback in that the delivered product may not fulfill the
customer's requirements.
- Water fall
- Build and Fix
- Prototyping
- Integrated waterfall and prototyping
p#15
The important feature
of extreme programming is the concept of __________________.
- Feedback
- Risk assessment
- Pair Programming p#20
- Requirement elicitation
__________________paradigm,
structures a team loosely and depends on individual initiative of the team
members
- Closed
- Open
- Random p#29
- Synchronous
_______________ Model
is developed keeping in mind the element of risk in the development of
software
- Spiral p#18
- RAD
- Incremental
- Synchronize and
Stabilize
Effective software
project management focuses on the four P’s: These are
- People, Product, Process,
Problem
- People, Passion, Process,
Project
- People, Product, Process, Project p#27
- People, Passion, Planning,
Project
In ________________
model the product is developed without any proper design and
specifications.
- Water fall
- Build and Fix p#13
- Prototyping
- None of the given
The _______________
dimension in rational unified process model represents the dynamic aspect of
the process.
- Angular
- Horizontal p#21
- Vertical
- Regular
Unrealistic deadline
is NOT one of the reasons of project failure.
Rapid application
development is another form of _________________.
- Prototyping model
- Incremental Model p#17
- Linear Sequential model
- None of the above
___________________ is
an Object Oriented model.
- Spiral
- Water fall
- Incremental
- Fountain p#20
Spiral model has
_____________ dimensions.
- 2 p#18
- 3
- 4
- None of the above
_____________dimension
of Spiral model represents the cumulative cost to date
Vision phase in a
software process focuses on __________.
____________________ Teams
generate more and better solutions than individuals and are most useful for
complex problems
- Decentralized p#29
- Centralized
In _________________,
there is both vertical and horizontal communication.
- Democratic decentralized
(DD)
- Controlled Decentralized (CD) p#29
- Controlled centralized
(CC)
- Synchronous paradigm (SP)
The _____________
model is used to overcome issues related to understanding and capturing of user
requirements.
- Water fall
- Rapid
Prototyping p#15
- Build and Fix
- None of the above
Pair programming is associated with:
RAD
- Incremental development
- Extreme
Programming p#20
- Prototyping
- Synchronize
and stabilize
Which one of the following is NOT a useful indicator of
software quality?
- Correctness
- Code
size p#63
- Maintainability
- Integrity
- Usability
Which one of the following does not belong to a strategy
for dealing with risk?
- Risk avoidance
- Security
risk assessment p#86
- Risk monitoring
- Risk management and Contingency planning
Three categories of risks are
- Business
risks, personnel risks, budget risks
- Project risks, technical
risks, business risks p#82
- Planning
risks, technical risks, personnel risks
- Management
risks, technical risks, design risks
The software reengineering process model includes
restructuring activities for which of the following work items?
- Code
- Documentation
- Data
- All of the given options p#65
One graphical technique for determining whether a process
exhibits out-of-control change behavior is a.
- Control chart p#70
- Fishbone
diagram
- Pareto
diagram
- Process
diagram
The first step in project planning is to
- Determine
the budget.
- Select
a team organizational model.
- Determine
the project constraints.
- Establish the objectives and
scope. p#75
A law affirming
that to continue after a certain level of performance has been reached
Will result decline
in effectiveness. This law is know as
- Law of Diminishing returns p#4
- Law of effectiveness
- Law of Saturation
- Law of Marketing returns
Build and Fix
model is a ___________ type of software development activity.
- Mathematical
- Perfect
- Haphazard (Reference book) p#32
- Planned
In
_________________ a team is structured along a traditional hierarchy of
authority
- Closed
paradigm p#29
- Synchronous paradigm
- Random paradigm
- pen paradigm
MTTC is the
abbreviation of
- Measured time to change
- Mean time to collaborate
- Mean time to change p#64
- Measure time
to cope
FAST is the
abbreviation of
- Facilitated Application Specification Technology
- Facilitated
Application Specification Technique p#75
- Facilitated Application Specialization Technique
- None of the above option
Defect per unit
function point is a
- Measure
- Metric p#61
- Measurement
- None of the above
The rapid
application development model is
- A useful approach when a customer cannot define
requirements clearly
- Speed adaptation of the linear sequential
model p#17
- Both are true
- None of them is true
Several entities are always created
-------------- and deleted together then this is a strong indication that they
should be grouped into ---------- logical file/files.
- Together, Single p#43
- Together, Multiple
- Together, Double
- All of the given
Chart that is used to develop the
individual control chart is called statistical control techniques.
A --------------entity is the one which
have any ----------- in the problem domain without some other entity.
- Strong, Role*
- All of the given
- Weak, Function
- None of the Given p# 47
------------------give you a better
insight into the state of the process or product.
- Metrics p#62
- Efficiency
- Reliability
- Usability
We need to employ some statistical
techniques and plot the result ---------------. This is known as Statistical
control techniques.
- Graphically p#69
- Automatically
- Manually
- Personally
The extent to which a program satisfies
its specifications and fulfills the customer’s mission objectives is …………………
- Integrity
- Reliability
- Correctness p#63
- None of given
Metrics to assess the quality of the
analysis models and the corresponding software specification were
proposed............
- Ricado in 1993
- Davis in 1990
- Davis in 1993 p#60
The most important objective of any
engineering activity is to produce high quality product with limited resources
and-----------------------
- Time p#62
- Persons
- Cost
- Metrics
The amount of computing resources required
by a program to perform its function is …………………..
- Efficiency p#63
- Integrity
- Reliability
- None of given
Of the ....................is a
pre-requisite of all sorts of estimates, including, resources, time, and
budget.
- Software scope p#75
- Software Risk
- Software Quality
- Software Management
Extent to which access to software or data
by unauthorized persons can be controlled and called……….…
- None of given
- Efficiency
- Reliability
- Integrity p#63
ILF is a --------------- identifiable
group of logically control in formations ------------- the boundary the application.
- User, within p#37
- User, without
- All of the given
- User, along
The level 1 of CMM is known as
- Managed
- Defined
- Initial p#10
- Repeatable
After building the Decision Tree,
following formula is used to find the expected cost for
Choose the correct formula:
- Expected Cost= (path probability) i *
(estimated path cost) p#78
- Expected Cost= (path probability) i / (estimated path cost)
- Expected Cost= (path probability) i + (estimated path cost)
- Expected Cost= (path probability) i - (estimated path cost)
__________________is data that influences
an elementary process of the application
- Elementary Process
- External Query
- External Output
- Control Information p#37
Empirical models are statistical models
and are based upon historic data
An entity which defines many-to-many
relationship between two or more entities is called
- Associative Entity Type p#42
- Attributive Entity Type
- Entity Subtype
- None of these
In context of moving
range and individual control charts, UNPL stands for:
- Universal Natural
Process Line
- Universal Natural
Process Limit
- Upper Natural Process Limit p#77
- Upper Natural Process
Line
The extent to which a
program can be expected to perform its intended function with required
precision is called ______
- Usability
- Reliability
page 67
- Portability
- Maintainability
When more than one
user interpret the same requirement in different ways then we can say that
the requirements are
·
none of the given
·
Incomplete
·
Incorrect
The Correct statement
is
·
None of the given
·
The greater the dependency between the components
the lesser is coupling
·
The lesser the dependency between the components
the greater is coupling
Function/Test matrix
is a type of
·
Interim Test report
·
Final test report
·
Management report
In measuring Software Process Quality by using
control charts, if the gap between the defects reported and defects fixed
is increasing, then it means
·
the
product is ready for shipment
·
the
product is in stable condition.
·
None
of the above
Top TO PAGE